1/3 of the working time, 1/2 of the equipment width
Pressure test equipment that creates more space on-site

Energy One Co., Ltd.
Executive Managing DirectorKimioOka
DNS-430E Pressure test equipmentIntroduction Case

Company name  
Energy One Co., Ltd.
location 
〒791-8057
1453-11 Okaga 3-chome, Matsuyama City, Ehime Prefecture
Number of Employees
60 people

Business content
LPG sales, gas appliance sales and gas facility installation
Introduction products
Pressure test equipment DNS-430E
URL
https://www.energy-one.co.jp


the purpose

- Updating the existing water-filled pressure test equipment to improve work efficiency

- Reduced frequency of repairs and maintenance


assignment

- I had to check each step of the process.

- As the facility became older, repairs and maintenance were increasing.


effect

- The test time has been reduced from 4 minutes to 2.5 minutes, allowing you to use the time for other tasks.

-Easy maintenance with easy-to-understand operation of each process


About Energy One Co., Ltd.

Energy One Co., Ltd. is based in Matsuyama City, Ehime Prefecture, and offers a wide range of services, including sales of LP gas, sales of gas appliances, construction of gas facilities, and even services related to remodeling and real estate. As an "energy and lifestyle consultation desk" that supports the lives of the local community, the company supports customers' safe and secure lives. The energy business is organized into a direct sales department that supplies LP gas to general households and a wholesale department that supplies to retailers, providing detailed services tailored to the needs of each customer. The wholesale department also re-inspects LP gas cylinder, conducting strict checks to ensure the safety of cylinder. This inspection allows all homes and businesses to use gas with peace of mind.

This time, we updated our fully automatic non-tank pressure test equipment, so we would like to introduce the update and the benefits it brings.

                     Update contents: Fully automatic non-water tank type pressure test equipment (DNS-430E)
Update date: September 2024

Existing control panel
Existing water-type pressure test equipment
Newly installed fully automatic non-water tank pressure test equipment

Reason for updating pressure test equipment

■Update device
Fully automatic non-tank pressure test equipment (DNS-430E)

Due to the aging of the entire facility, the company considered updating its pressure test equipment. Before the update, the water-tube type pressure test equipment had many breakdowns, and repair parts had to be made to order, which increased the delivery time and cost, which was one of the reasons why the update became a high priority. In addition, the water tank used for the pressure testing of the water-tube type pressure test equipment was located inside the pit, so cylinder had to be raised and lowered every time a test was performed, which posed an issue in terms of work efficiency.

Since the client wanted to upgrade to equipment that would improve work efficiency and free up space for work, we proposed the fully automatic non-water tank pressure test equipment (DNS-430E).

Benefits of updating pressure test equipment

■ Benefits
Improved work efficiency and processing capacity

The pressure test involves four steps: water injection, pressure resistance, drainage, and drying. Previously, after each step, we had to press the start button for the next step, and the water injection step required manually attaching a nozzle, but now that these
are all automated, we no longer have to check the state of cylinder in front of the device. This means we can spend more time on marking and visual inspections, which has improved work efficiency. Securing work space was an issue before the upgrade, but now that the width of the device has been reduced by about half, we can work in a more spacious area. The pressure test processing capacity,which took about four minutes per bottle with the previous device, can now be completed in about two and a half minutes.

Furthermore, with the previous equipment, the pressure resistance process was carried out inside a pit, making it difficult to detect faulty parts and perform maintenance. With the updated equipment, the location of each process can be clearly identified, making it easier for the customer to perform daily maintenance themselves. Furthermore, the test pressure is displayed numerically on the panel, making it easier to check.

■ Pressure test
By integrating the control panel and the equipment, more space is available around the equipment.
Operation panel screen
Energy One Co., Ltd. is expanding various services to contribute to making customers' lives more comfortable as an "energy and lifestyle consultation center." We would like to do our best to be of service to Energy One Co., Ltd., which is closely involved in the local community through its energy business.

Energy One Co., Ltd.

Address: 1453-11 Okaga 3-chome, Matsuyama City, Ehime Prefecture, 791-8057
TEL 089-952-7711
URL
https://www.energy-one.co.jp

Introduction products

If you have trouble with industrial machinery
Please consult Daido Kogyo first.

Please feel free to contact us if you have any questions.
Please contact us.
For detailed information about the service