High pressure gas cylinder pressure test equipment


高圧ガス容器検査設備について

High pressure gas cylinder can be broadly divided into welded cylinder and general seamless cylinder.

- Welded cylinder (mainly filled with LPG): Every 5 years for those less than 20 years old, and every 2 years for those more than 20 years old.

- General seamless cylinder (mainly general high-pressure gas): Every 5 years after manufacture.

In addition to the pressure test, high pressure gas cylinder are refurbished through various processes.

We provide comprehensive engineering for pressure testing lines, with a focus on pressure testing equipment.

LP gas cylinder inspection equipment

Pressure test equipment for LP gas

We offer everything from fully automatic devices that do not require an operator to low-cost, simple models and space-saving models.

Valve desorption machine for LP gas

We have a wide range of equipment to suit the work environment and inspection laboratory size, from fully automatic valve removers to equipment for explosion-proof environments to simple demounters.

Re-inspection system for LP gas

As a re-inspection system, we have a variety of lineups to suit your environment, including office server machines, field terminals, label issuing terminals, and handheld terminals.

General high pressure gas cylinder (seamless cylinder) inspection equipment

Pressure testing equipment for general high pressure gas

Similar to those for LP gas, we offer everything from fully automatic devices that do not require an operator, to low-cost, simple models, and space-saving models.

Valve detacher for general high pressure gas

This product is pitless and easy to install.

General high pressure gas re-inspection system

We have a lineup tailored to your environment.

If you have trouble with industrial machinery
Please consult Daido Kogyo first.

Please feel free to contact us if you have any questions.
Please contact us.
For detailed information about the service
You can download it here.