
The four processes of water injection ⇒ pressure test ⇒ drainage ⇒ drying are all carried out automatically by conveyor. Since each process can process two pieces at a time, it is possible to increase the number of tests while saving space.
Utsunomiya Propane cylinder Inspection Factory Co., Ltd.
Optimize operations by reducing labor and improving processing capacity
In preparation for publication
In preparation for publication
The four steps of water injection ⇒ pressure test ⇒ drainage ⇒ drying are all carried out automatically using a conveyor. By using the optional "tag reader" and "re-inspection system", it is possible to create an automatic line without the need for an operator.
Energy One Co., Ltd.
Pressure test capacity has doubled! Achieving greater efficiency
In preparation for publication
In preparation for publication

One cylinder is fixed to each side of the device body, and pressure resistance tests are performed alternately on the left and right sides.
Work such as fixing cylinder, operating the valve when cylinder falls over, and attaching screw joints and metal fittings are all done manually, but the pressure test and drainage and drying processes are all performed automatically.
FAQ
Q.
A.
The fully automatic type automatically performs the entire series of pressure testing steps, including water injection, pressure resistance, drainage, and drying.
The simple type requires manual operation by an operator for fastening cylinder, attaching the fittings, and tipping, but the pressure-resistance process and drainage and drying process are performed automatically.
Q.
A.
The fully automatic model is compatible with 10-50kg and 50kg siphon cylinder.
The simple type is available in 8-50 kg capacity, with a 50 kg siphon cylinder and an FRP cylinder (optional).
*Small cylinder and car cylinder can be handled with a manual type (manual pump type).
Q.
A.
The maximum processing capacity is 25 to 30 bottles per hour for the fully automatic type and 15 to 20 bottles per hour for the simple type.
*Please note that the time required for filling with water, etc. varies depending on the type of cylinder, so please use this as a guideline.
Q.
A.
Re-inspection SystemIt is possible to link with.
The results of the pressure resistance test can be sent as data to the system, and reports such as report sheets, daily and monthly tables can be issued.
Consultations take just one minute. For urgent inquiries, we can also assist you by phone.