Manual stationary LP gas filling machine
S-EA-IV

Manual stationary LP gas filling machine
S-EA-IV

Product features

An LP gas filling machine with improved waterproofness, visibility, and safety.

Indication section Explosion-proof grade

Ex db ⅡB T6 Gb

Weighing platform explosion-proof grade

Ex mb ⅡC T6 Gb

Weighing platform waterproof grade

IP67

Improved waterproofing of the weighing platform
(Waterproof grade IP67)

The weighing platform uses a resin-filled explosion-proof load cell. Compared to conventional pressure-resistant explosion-proof structures, it is more waterproof and less susceptible to the effects of humidity and water.

Full-color LCD display
Visibility UP

The full-color LCD display greatly improves visibility. The clear display allows you to check numerical values and operation information at a glance even while working, reducing the risk of visual errors.

Thin base for compact size
Achieving shorter construction time

The adoption of a resin-filled explosion-proof digital load cell has made it possible to make the weighing platform thinner. Installation can be carried out by reusing an existing pit, eliminating the need for extensive foundation work.

Product Specifications Table

Refillable gas

LP gas (JIS K 2240)

Capacity (kg)

150.0

Graduation (kg)

0.1

High pressure section design pressure (MPa)

2.35

Air Supply

・Air pressure: 0.6 to 0.7 MPa
・Consumption 5.0NL/min

Power supply

Voltage: Single-phase AC100V 50/60Hz
・Power consumption 40W

Dimensions (mm)

Width 530 x Depth 765 x Pit top height 1728 x Pit bottom height 250

Mass (kg)

Approximately 160

FAQ

FAQ

Q.

Is pit construction required when updating a filling machine?

A.

Please compare your existing pit with the pit reference diagram.
There are variations in the dimensions and specifications of the weighing platform, so we can also propose specifications that suit your existing pit.

*We may not be able to accommodate your request, so please contact us first.

Q.

Please tell me the construction period.

A.

If an existing pit is used, installation can be completed in just 1-2 days, and can be completed over a weekend. From the start of removal to the final inspection, it takes approximately 3 days to complete.

Q.

Is it okay if the filling machine gets wet during the water spray test?

A.

The S-EA-IV has enhanced waterproofing and is water resistant, but it is not a completely waterproof product, so please take measures such as ensuring drainage in the pit and covering the indicator.

A special cover for watering is available as an option.

Q.

What should I do if thunder starts to rumble while I'm filling up?

A.

Lightning strikes can damage electronic components, so if you hear thunder nearby, stop operation and turn off the power.

Related Products

Related articles

What makes the UNIDACK filling machine so accurate and safe? We will clearly explain the features of Kubota's unique high-precision load cell technology, thorough quality control, and the latest model, "S-EA-IV."

If you have trouble with industrial machinery
Please consult Daido Kogyo first.

Please feel free to contact us if you have any questions.
Please contact us.
For detailed information about the service
You can download it here.